Infrastructure For The Area Zone 1-, Zone 2-, ECP1-, ECP2 For Camp Arifjan
Infrastructure For The Area Zone 1-, Zone 2-, ECP1-, ECP2 For Camp Arifjan, 4 K.m2 The Scope of Work is to Make The Design for Storm Water, Zone Drainage & Walk Ways Including All Landscape Areas & to Redesign All Buildings Entrance Inside The Zones Modify The Entrance & Exit for the Whole Zones According to the New Design Levels.
Client:
AECOM
Cost:
K.D 8 Million